Containment Systems

Large facility winterization project

TJD has built and installed winterization panels on a multiple story medical facility. We setup and maintained all temporary heating equipment during the winter month’s construction. 

TJD setup and maintained a heated containment system that would prevent the sub-grade from freezing during construction on a large retail facility.

Negative Pressure

TJD built a double walled containment system in a sensitive facility. The company needed an area of the facility to be cleaned and painted without disruptions to plant operations. The negative pressure containment system was designed to keep all paint particulate in the contained area without disruptions of plant operations.

 

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player